Â鶹ӳ»­Ó°Òô

Steel Bridge Competition

The Steel Bridge Competition is sponsored by the American Institute of Steel Construction. Students design, fabricate and construct a 1:10 scale model steel bridge.

The bridge is built during the competition, then is load tested with 2,500 pounds and its deflection is measured. The winning bridge is based on its design, construction time, weight, deflection and economic practicality.

Current Officers

President - Julie Hammond
Vice President - Andre Trottier
Secretary / Concrete Canoe Co-Captain - Johnita Goodman
Treasurer - Faustino Cisneros
Events Coordinator / Steel Bridge Co-Captain - Fernando Aleman
Historian / Concrete Canoe Captain - Mariam Abedelwahab
Steel Bridge Captain - Hayden Rice

steel bridge participants

Competition Years

2006: Regionals in Kingsville

  • First Place Aesthetics
  • Second Place Construction Economy
  • Fourth Place Construction Speed

2005: Austin, Texas

  • Fourth Place Overall
  • Third Place Construction Speed
  • Fourth Place Lightness
  • Second Place Aesthetics
  • Fourth Place Stiffness
  • Fourth Place Economy
  • Fourth Place Efficiency

2004

steel bridge participants steel bridge participants steel bridge participants

2002

  • Second Place Overall (1st Bridge Entry)
  • Third Place Overall (2nd Bridge Entry)
  • First Place Construction Speed
  • First Place Structural Stiffness
  • First Place Construction Economy

2001: Houston

steel bridge participants steel bridge participants

2000

  • First Place Overall
  • First Place Efficiency
  • First Place Stiffness

1992

  • Third Place Overall
  • First Place Stiffness